White Eagle Lodge

The Challenge The project, whilst relatively small, was highly complex, particularly the temple itself. This was because of the nature and function of the building and the corresponding physical and geomantic factors we needed to consider during design development, through procurement and into constructing its complicated form. The precast concrete arch geometry was one of […]

150 Borough High Street

The Challenge We provided cost consultancy advice including early options appraisals for both refurbishment and demolition/new build. The final design included roof and rear extensions that greatly increased usable floor area, with a relocated stair core improving the building flow and providing the required opportunities for the division of office floors. Once works commenced on […]

The Wolves Lane Centre

“The project is a living example of how bio-regional materials can be applied to an urban site. The project brings much needed infrastructure to the Wolves Lane Centre supporting it to build resilient communities and ecosystems” Paloma Gormley Director of Material Cultures

Michael Faraday House

The Challenge The project provided a number of challenges including designing the works so that they could be undertaken in an occupied space, integrating new technology and services into the existing building structure and fabric and completing works concurrently with the construction of a new deck car park on land adjacent to the main building. […]

New Hibernia House

The Challenge The site is landlocked on all sides and, with the hugely popular Borough Market directly opposite and residential blocks adjoining, this presented serious logistical constraints and challenges for the team.  Significant negotiations were held with the local authority to allow us to close footways on the very busy Winchester Walk and to install […]

80 Goswell Road

The Challenge Poor water pressure in the unit was addressed via the installation of a new water tank and booster on the roof, and this element of works required licenses to be submitted to TfL to obtain the required road closures in a timely manner. Modifications to the existing ventilation were required to increase natural […]

12 Little Portland Street

The Challenge Formerly known as Remo House, 12 Little Portland Street sits alongside Langham House with each building served by an independent entrance but linked through internal doors. A number of feasibilities were looked at from complete refurbishment of both buildings, the possible extension of the buildings to the rear and standalone refurbishment of each. […]

West Downs Teaching & Learning Centre

The Challenge A key challenge to the project was finalising the contract sum through the second stage procurement process. A Cost Plan and package split methodology had been agreed with the Contractor, however individual work packages were consistently being returned over the Cost Plan allowance. Our cost data resources and market research was unable to […]

80 Grosvenor Street

The Challenge The project required the team to address a number of challenges posed both by the site and the exacting design to maximise the floor space created in this very constrained site. The building sits over two live Thames Water sewers which required careful survey and exploratory works during the design period and detailed […]

ArtsEd Schools

The Challenge In order to minimise disruption to the school and its activities the project was completed in 3 phases which were carefully programmed around the academic calendar. Our input as Principal Designer saw us make valuable interventions to the evolving design in particularly in respect of access and maintenance. In our role as the […]