15 Bishopsgate

The Challenge The existing building fronting Bishopsgate was part of the Tower 42 Estate and sat on top of the existing basement structure which extends beneath the main tower building. As a result, demolition and construction of the new building on Bishopsgate needed to deal with the challenge of vibrations to the foundations of the […]

Francis Holland School – Centre for Creative Learning

The Challenge All of the works have been planned to minimise disruption to the ongoing academic activities and to tie in with the school timetable. The site is tightly constrained and logistically challenging and the school is also located in the Belgravia Conservation Area bounded by back gardens and the underground. Our team have built […]

Pinnacle N10

The Challenge The extremely restricted site and stepped topography created complexities in terms of the envelope design and associated detailing and no real opportunities for replication options. This was turned into a positive, with the geometry of layouts used to maximise the views for residents across London from Muswell Hill. At the time this was […]

Berkhamsted School – Various Projects

The Challenge Our current focus is the delivery of the new Sixth Form Centre which will provide a new centralised hub for 425 pupils on the school’s historic Castle Campus. The location is significant in the context of both the school’s Listed buildings and the public realm at the heart of the town centre, with […]

The Cathedral & Abbey of St Alban

The Challenge The scheme includes the considered alteration and repair of the existing arrangement of hard and soft landscape works to compliment the newly built visitor reception building and the Cathedral, which sits in an area that has Scheduled Ancient Monument (SAM) status. As the project was fully funded by fundraising the importance of achieving […]

Hauser & Wirth Somerset

The Challenge Each of the Grade II Listed farm buildings at Durslade had been empty for a number of years and were in complete disrepair. There was also a pressing need to complete the project in time for a planned opening of the gallery. Our approach to these issues was to simplify and de-risk the […]

160 Old Street

The Challenge The project had a number of challenges primarily the condition of the existing structure, the previous uses of the site, it had previously been a Bovril factory and the complexity of the subterranean basement car park levels. Early in the programme we advised the client to commission extensive site survey works in order […]

110 – 114 Middlesex Street

The Challenge The 7 storey building had been configured as a labyrinth of small offices, retail units and plant rooms, which led to very inefficient circulation and access routes through the building. A key challenge was altering the existing ventilation routes, including into a substation housed within the building. Extensive negotiation with UKPN was required […]