Southbank Centre Festival Wing

The Challenge Based on our experience of working with arts organisations on other build projects we were appointed by Arts Council England at the end of RIBA Stage 2. Our role was to provide specialist capital project monitoring support to ACE’s Capital Projects Team and the Southbank Centre during the detailed design development, procurement and […]
Walcot Square Mews

The Challenge Despite the careful consideration given to make sure that the proposed development sat comfortably with the buildings and area around it together with the support of local civic bodies and Lambeth Council, the scheme met with heavy opposition from immediate neighbours. In our role of Project and Development Manager and with the support […]
White Collar Factory

The Challenge We and the design team looked at how flexibility for tenants could be maximised and material use could be minimised, warehouse type internal volumes created and servicing of the building re-invented. This leaner, greener approach to office space targeted a 25% reduction of energy in use. This was achieved by reducing the reliance […]
AIR Studios

The Challenge The main recording area accommodates a full symphony orchestra and choir simultaneously and has been used to record numerous iconic film scores, whilst further smaller studios are continually used by many world famous artists and bands. A key challenge was completing the project whilst ensuring a minimal amount of downtime and closure of […]
Mount Row

The Challenge A particularly challenging aspect of the project was the construction of the new double height basement given the site’s close proximity to the Jubilee line, which runs underneath an adjacent property. There were also numerous party wall issues for our party wall surveyor to overcome, which involved lengthy discussions with adjoining owners’ representatives. […]
1 – 5 Cromwell Place

The Challenge Built on a tight island site and bounded by a TfL Red Route, the excavation of the basement and construction of the new glass bridge and gallery had to be carefully planned and phased in line with the sensitive negotiation with the neighbouring properties. The relationships and budgetary constraints of the freeholder (the […]
SEAT Westfield

“The store opened up the brand to a whole new generation of buyers” Richard Harrison Managing Director, SEAT UK
63 Pall Mall

The Challenge The building is located in the St James’s Conservation area on a very tight, sensitive urban site with no rear access. This meant that site logistics and deliveries were planned in minute detail and tightly controlled throughout the works. Continual communication with neighbouring residents and businesses were essential both prior to beginning work […]
Farm Shop

The Challenge As Principal Designer, we helped form the access and maintenance strategy and ran CDM workshops to ensure all aspects of health & safety compliance were followed. As CDM Advisor we then attended site throughout construction to audit works as they progressed. Challenges including the discovery of asbestos and water ingress were handled by […]
Bonhams Headquarters

The Challenge One of the key client requirements was to ensure sales, operations and other core activities could be continued throughout the entire construction period. This created challenges in programming and coordinating the works, and our management of this with the contractor was critical. As with most buildings in Mayfair, the design needed to allow […]
Claridge House

The Challenge The project took place whilst the building was in both residential and commercial occupation during the, which created challenges around phasing and tenant liaison. The introduction of the new Building Safety Act and Building Safety Regulations meant there were a number of stop-starts during the design stage due to emerging complex regulatory and […]
Albemarle Street

The Challenge We were engaged on this project from inception and played a critical role in ensuring it received planning consent. Once on site, an added complexity to the project was that a world-famous Japanese restaurant, situated in part of the ground floor and basement of the existing building, remained trading for the duration of […]
The Rose, Campbell Park
Howe Park Wood Education & Visitor Centre
Great Things Lie Ahead – Holborn House