Saltholme Pools Hide

The Challenge The logistics and constraints of the site made this a challenging project to deliver. Areas of the surrounding nature reserve have been designated both as a Wetlands Site of Special Scientific Interest (SSSI) and a Teesmouth and Cleveland Special Protection Area (SPA). Landscaping to make the building fully accessible to families and disabled […]
Illuminated River

The Challenge The project posed a number of challenges in relation to the approval process, the specification of the fixtures and fittings used and carrying the works out over the Thames which itself is one of the world’s busiest river ways. The bridges fall under the control of a number of stakeholders, including Network Rail, […]
Hannington Farm

The Challenge Our Clients acquired this former farmstead and the derelict farm buildings that surrounded it, with the intention of creating a modern, high quality family home and restoring the landscape they sit within all with an emphasis on sustainability and respect for the natural environment. We worked closely with the client and design team […]
The Old Vinyl Factory

The Challenge The Record Store development is located adjacent to the mainline railway and extensive discussions with Network Rail were needed to secure the permissions needed to allow the refurbishment of the historic art-deco facades to be carried out. The retained building was an early example of a concrete framed structure which needed extensive repairs […]
Astley Castle

The Challenge The project was technically challenging particularly with the necessary conservation of the remaining fabric of the castle. As well as being Grade II Listed the site was designated as a Scheduled Ancient Monument in 1994 and was officially a Building at Risk. Foundations, walls, lintels and roofs required to buttress and tie the […]
Depot Cinema, Lewes

The Challenge The Depot was designed and built on environmentally responsible principles with a determination to create a venue with the lowest possible impact on the climate. Cinemas use a lot of energy, so minimising energy consumption was a key challenge for the project team. A ground source heat pump, which involved boring twelve pipes […]
Walthamstow Wetlands

The Challenge The site is owned by Thames Water and has a SSSI/RAMSAR designation as a wetland of international importance. In addition to managing the usual complexities associated with working on a Listed Building, a key part of our role was to manage the competing demands of multiple stakeholders and funders, who included Thames Water, […]
Leighton House Museum

The Challenge A central component of the project was the recovery and restoration of several parts of Leighton House that had been ‘lost’ through changes made during the twentieth century. A first floor balcony and an extension to the original house, built in the 1880s and supported on cast iron columns, have now been fully […]
Hampton by Hilton

The Challenge The site gave the team a number of challenges in the form of flood protection measures required due to the proximity of the site to the river; asbestos removal from the existing buildings demolished to make way for the hotel; ground remediation; and careful liaison with the York Archaeological Trust. Working closely with […]
FORA Spitalfields – Folgate Street

The Challenge Key to the success of the development was working closely with the Client and design team to ensure that the number of workspaces that could be incorporated onto the floorplate was maximised to secure the viability of the scheme. Together with the design team, we undertook a number of studies to assess areas […]
MK Gallery

The Challenge As a high-profile and highly anticipated project for Milton Keynes and the wider local community, stakeholder management was a major part of our role as project manager for the project. Strategic partners including Milton Keynes Council and Arts Council England, who both provided significant funding for the project, were regularly appraised of progress […]
Central Square, Leeds

The Challenge The challenge for Jackson Coles was to agree an ambitious but robust budget with the Client that could deliver the desired look and feel for the space. Through a number of design reviews and benchmarking exercises a fit-out cost range of £65-70/ft² was agreed as being appropriate for the Client’s design aspiration. The […]
Brighton Dome Corn Exchange & Studio Theatre

The Challenge Alongside the inevitable challenges of renovating a 150 year old building the delivery of this project was also complicated by the insolvency of the initial main contractor part way through the build, together with the COVID pandemic and inflationary and supply pressures resulting from Brexit and the conflict in Ukraine. The effects of […]
One Berkeley Street

The Challenge The retained concrete frame structure had been built over a number of years as the original building was adapted and expanded. There was very little record information about the frame and extensive investigation works were required which had to be undertaken whilst the existing hotel and office areas remained in use. Given the […]
The Charterhouse – Various Projects

The Challenge Our original appointment was to provide cost advice on the major construction project to “reveal” The Charterhouse to the public. We also provided services on both the HLF Stage 1 and Stage 2 applications to the client. Following confirmation of a successful Stage 2 application we were retained as the cost consultant and […]